About Us

Staff & Crew

Randy Bonnevie

Owner

Owner Randy Bonnevie has been in the construction Industry since his early teen years working with his father and brother. He joined the Marines in 1976, after serving almost 5 years he was honorably discharged in 1981. Randy decided to get back into the construction field he loved so much and hasn’t looked back since. He joined the USAR, 187th Infantry Bgd. in late 1981 and worked for a few well-respected local contractors before deciding to start his own business and established Bonnevie Construction in 1987. He Incorporated the business in 1997 after retiring that same year from the military. He enjoys taking a hands on approach in every aspect of the business. His passion is in designing his customers dream projects and enjoys working with his fellow employees and customers to achieve those goals. Randy has a strong commitment to a high level of customer service, quality craftsmanship and an honest set of values that he leads his company by.

Chris Guptill

Project Manager

Chris is our projects manager and our lead man in the field. He assists in job estimation, scheduling and quality control. He ensures a high level product quality is delivered on every project we do. His dedication to high customer service, satisfaction and honest values is what makes him a key asset to the company. His knowledge of the construction field shows in everything Chris does and has been a major part of Bonnevie Constructions success over the years.

Chris has been with BCI since 1997 and is an integral part of the company.

Ryan Bonnevie

Ryan has been working with the company since he was a young teen with his Dad through the summers.  He joined BCI full-time after graduating from Exeter High School. Ryan continues his education by learning about alternative energy, energy efficiency/compliance, as well as recycling methods. Ryan also continues to hone his skills in finishing techniques.  Ryan is the Logistics Manager in the field and is responsible for setting up the jobs with the materials and equipment need to complete them.

Ryan has been with the company part-time since 2003 and full-time since his graduation in 2007.

Kelly Baldarelli

Office Manager

Kelly is our office manager and the first point of contact for our clients. She will answer your calls and address your questions and concerns along with scheduling your sales call appointment. Kelly has 25 years experience in customer service and office management and her family has been in the construction industry for over 75 years. She believes communication is key and every customer experience be as positive as possible.  Her attention to detail, outgoing nature, and dynamic personality make any interaction an enjoyable one!

Our 7-step Design Build Process

This 7 step construction design build process is what has ensured that Bonnevie Construction has met or exceeded expectations in our over 26 years of business. Call Bonnevie Construction at 603-580-5680 in NH or 978-388-6044 in MA and schedule a free consultation today! We respond within 24 hours and do our best to work around your schedule.

1

Free In-Home Consultation

  • Establish your design ideas and your overall needs
  • Evaluate the project’s feasibility
  • Review potential design options and clarify the project scop
  • Establish your budget or investment range (Budgets are discussed so the design fits the budget, not the other way around)
  • Review the design agreement
  • Sign design & specification agreement (unless owners have all required drawings, documents and project specifications for accurate estimates)

2

Initial Design Development

  • Measure, photograph and document existing conditions
  • Additions -Establish lot set back requirements and access excavation area
  • Develop a project scope based on your needs and preferences
  • Consider and discuss your budget requirements
  • Review 3-D drawings (preliminary floor plans & design perspectives)
  • Evaluate design options and/or restrictions
  • Kitchens-Discuss appliance options and local retail store recommendations (owners evaluate and purchase their own appliances with guidance as needed from us)
  • Discuss any major or minor design alterations and revise as needed (discuss any structural issues that may need engineering approval)
  • Review the project scope and budget
  • Approve the preliminary design

3

Design & Specification Development

  • Evaluate product options and benefits
  • Finalize your product selections
  • Cabinets, Counter-tops (Schedule meeting at show room of cabinet supplier and counter-top fabricator)
  • Windows & Doors
  • Exterior requirements
  • Plumbing Fixtures, Faucets & Accessories
  • Electrical and Lighting
  • Interior Doors, Mill work & Trim
  • Wall & Ceiling Finishes
  • Flooring (tile, wood, laminate, vinyl, carpet, other)
  • Review final design plan (changes due to owners product selection, if required)
  • Review project specifications
  • Review budget based on final design and specifications
  • Produce final plans & specifications
  • Produce & review estimates
  • Sign construction contract/agreement
  • Obtain building permits as required (owner to produce Site/Plot Plans if required)

4

Pre-Construction Conference

  • Review the project schedule, discuss milestones and any customer purchased item due dates.
  • Discuss specific homeowner concerns and requests (where construction vehicles need to park, pet issues, bathrooms to use, dumpster location etc…)
  • Explain project procedures and work flow
  • Review the project specifications
  • Review the project construction plans
  • Set up schedule for weekly site meetings
  • Answer your questions and concerns

5

Project Production Procedures

  • Weekly job site meetings
  • Dust control
  • Work site regulations and safety (daily and weekly clean up and organization of materials, tools & equipment)
  • Project milestone evaluation and adjustments for any changes to contract.
  • Halfway There -project walk-through, approval/inspections

6

Project Completion Procedure

  • Quality Assurance, Pre-Completion Checklist
  • Final project walk-through
  • Notice of completion

7

Warranty and Follow-up

  • Issue our 2-year written warranty
  • Homeowner Satisfaction Evaluation
  • 30 day follow up
  • Six month follow up
  • One Year follow-up